For suppliers

Tender monitoring

The services that are the subject of this acquisition consist of capital repair services for 2 NMV 2000 RA type electric pumps related to the U1 & U2 Condenser Cooling Water System (BSI 71210) within a period of 48 months (effective provision). Requests for clarifications or additional information regarding the award documentation will be submitted by economic operators at least 16 days before the deadline for submitting offers. The contracting entity will only respond to clarification requests addressed by economic operators until the established deadline. The contracting entity's response to these requests will be sent in two stages, as follows: 25 days before the deadline for submitting offers (for requests received 30 days before this date) and on the 11th day of the deadline for submitting offers, for the remaining clarification requests, in accordance with art. 173 of Law no. 99/2016 with subsequent amendments. ATTENTION!!! THE CONTRACTING ENTITY WILL ONLY RESPOND TO CLARIFICATION REQUESTS ADDRESSED BY ECONOMIC OPERATORS UNTIL THE ESTABLISHED DEADLINE (16 DAYS BEFORE THE DEADLINE FOR SUBMITTING OFFERS)

Closes 16 Nov 2026Budget€2.2M

1. The subject of this order is the comprehensive supply of electricity to the facilities listed in Appendix No. 1 to the ToR – description of the subject of the order. The demand for electricity in the period from 01.01.2027 to 31.12.2027 is: 1,239,763 kWh of basic order. 2. The detailed scope of the order has been defined in Appendix No. 1 to the ToR, in accordance with the provisions of the Act of April 10, 1997, Energy Law. Other conditions regarding the execution of the order have been defined in the draft provisions of the electricity sales agreement – Appendix No. 2 to the ToR. The comprehensive supply of electricity will take place under the conditions specified by the provisions of the Act of April 10, 1997 – Energy Law, the Act of December 8, 2017, on the capacity market, and in accordance with the executive regulations issued for these acts, in particular with the quality standards of customer service specified in the Regulation of the Minister of Climate and Environment of September 9, 2023, amending the regulation on the method of shaping and calculating tariffs and the method of settlements in electricity trading, the Regulation of the Minister of Climate and Environment of March 22, 2023, on the detailed conditions for the functioning of the power system. The above provisions concern the method of calculation, settlements, and quality parameters of the supplied electricity. 3. The requirements (obligations) placed on the Contractor are described in the draft provisions of the agreement, constituting Appendix No. 2 to the ToR. The Contracting Authority will grant a power of attorney to the Contractor selected in the procedure.

Closes 17 Nov 2026

1. The subject of the order is the supply and installation of a power supply system consisting of a RES installation with accompanying infrastructure in Olecko, Olecko commune, as part of a renewable energy power station in the project entitled "National research infrastructure for the development of GNSS/ADS-B systems with particular emphasis on automatic threat detection ŚWIATOWID". 2. The subject of the order includes: 1) development of a technical design of the System, covering the entire scope of the ordered item specified in Part IV of the ToR. The design must be complete from the point of view of its intended purpose and comply with applicable legal provisions. The Contractor is obliged to agree on the design to the extent required by applicable legal provisions; 2) delivery of all devices and materials necessary for the execution of the order to the location indicated by the contracting authority in Part IV of the ToR in point 2.1.; 3) performance of works necessary for the proper placement, installation, configuration and commissioning of the System consisting in particular of RES installations, control automation and management and protection systems, 4) preparation of as-built documentation and commissioning of the System, as well as performance of all other activities necessary for the proper execution of the order in accordance with the requirements specified in these ToR, applicable legal provisions to the extent they apply, recommendations of relevant public administration bodies; 5) conducting training for persons designated by the contracting authority in the use of the System along with the necessary infrastructure, in accordance with the requirements specified in Part IV of the ToR; 6) granting a quality guarantee and performing services resulting therefrom, including also performing inspections and services necessary to maintain the quality guarantee, in accordance with the contracting authority's requirements specified in Part IV of the ToR. 3. Detailed requirements for the subject of the order are an integral part of the description of the subject of the order and are contained in Part IV of the ToR, where, in accordance with Article 99(6) of the Public Procurement Law, the contracting authority also indicated the criteria used to assess equivalence. 4. Other requirements for the subject of the order and the contractor's obligations are indicated in the model contract, constituting Part III of the ToR. 5. The Contractor is obliged to grant the contracting authority a quality guarantee and is obliged to perform services resulting therefrom. Requirements regarding the guarantee are specified in Parts III and IV of the ToR. 6. The delivered subject of the order must be factory new, not displayed at exhibitions, complete and technically efficient. The term "factory new" means the subject of the order originally packed, unused before the delivery date, with the exception of use necessary to test its proper operation after production. 7. The delivered subject of the order must be free from any physical and legal defects and claims of third parties. 8. The delivered subject of the order must come from a manufacturer's distribution channel that does not exclude distribution to the Polish market and ensures the exercise of warranty rights. 9. The subject of the order must be delivered with operating instructions, drivers and any accompanying software necessary for the proper use of the subject of the order (to obtain full functionality indicated in Part IV of the ToR). The contracting authority will not be obliged to pay any additional fees, in particular license fees, and any licenses will be granted as part of the contractor's remuneration, without time and territorial limitation, unless explicitly stated otherwise in Part IV of the ToR. If licenses, codes or other authorizations are needed to run and use this software, they must be delivered without additional fees. Codes, licenses and other authorizations must also be delivered if they are necessary to start or configure hardware components. Operating instructions, drivers and any accompanying software should be delivered at the time of handing over the as-built documentation. The requirement referred to in the first sentence may be met by the contractor by providing the contracting authority with access to the manufacturer's website, where instructions, software in Polish or English, etc. will be available. In such a case, the contractor is obliged to provide the contracting authority with the as-built documentation, codes, passwords, etc., if they are necessary to use this service. 10. The offered subject of the order on the date of preparing the offer may not be planned by the manufacturer for withdrawal from production or sale. 11. The delivered subject of the order intended for power supply from the power grid must be equipped with an appropriate number of power cables allowing it to be connected to standard power sockets, unless otherwise indicated in Part IV of the ToR. 12. On the date of acceptance of the subject of the order, the System must be complete, fully operational and ready for use. All elements included in the System must be properly prepared, installed, configured and interconnected, in accordance with the requirements specified in the ToR, technical documentation and the principles of technical knowledge and applicable legal provisions. The remaining description of the subject of the order was included by the contracting authority in the procurement documents - Terms of Reference - point I.3.

Closes 19 Nov 2026

The City of Radzyń Podlaski, represented by the Mayor of the City, on the basis of Article 38(1) and (2) of the Public Procurement Law and the agreement of 8 October 2026, is conducting proceedings on its own behalf and on behalf and for the benefit of the following Contracting Authorities: Municipal Kindergarten No. 1, ul. Armii Krajowej 12, 21-300 Radzyń Podlaski; Municipal Kindergarten No. 2, ul. Chmielowskiego 8, 21-300 Radzyń Podlaski; Municipal Kindergarten No. 3, ul. Reja 2, 21-300 Radzyń Podlaski; Primary School No. 1, ul. Jana Pawła II 25, 21-300 Radzyń Podlaski; Primary School No. 2, ul. Sitkowskiego 3, 21-300 Radzyń Podlaski; Municipal Social Welfare Centre, ul. Warszawska 32, 21-300 Radzyń Podlaski; Municipal Public Library, ul. Armii Krajowej 5, 21-300 Radzyń Podlaski; Radzyń Culture Centre, ul. Jana Pawła II 4, 21-300 Radzyń Podlaski; Municipal Sports and Recreation Centre, ul. Sikorskiego 15a, 21-300 Radzyń Podlaski; Daily Environmental Self-Help Home, ul. Bulwary 12, 21-300 Radzyń Podlaski. The entities listed above are hereinafter referred to as “municipal organizational units”. The City and municipal organizational units will conclude separate agreements for the purchase of electricity. The subject of the contract includes the supply of electricity and the repurchase of energy generated in RES installations, in accordance with applicable regulations and quality standards specified in the Act of 10 April 1997, Energy Law, and its implementing regulations, for the City of Radzyń Podlaski and municipal organizational units for the operation of buildings, premises, utility facilities and street lighting. A detailed description of the subject of the contract is included in Annex No. 1 and, respectively, in Annexes No. 7a, 7b, 7c, 7d, 7e, 7f, 7g, 7h, 7i, 7j and 7k to the SWZ. Deliveries will be carried out from 1 January 2027 to 31 December 2028. The forecasted demand for electricity and the forecasted volume of energy from photovoltaic installations introduced into the distribution system operator (DSO) network during this period are specified in Annex No. 1 and Annexes No. 7a-7k to the SWZ. The forecasted consumption and volume of energy introduced into the DSO network are estimated values and are used to calculate the offer price. Settlement will be based on actual electricity consumption, based on current readings of metering and billing systems. The Contracting Authority reserves the right to successively purchase energy in quantities resulting from current needs. The forecasted volume was determined based on previous consumption. The total estimated volume of electricity supply in the period 2027–2028 is 2,254,136 kWh, and the volume of energy intended for repurchase is 136,243 kWh. The Contracting Authority allows for a reduction or increase in the total volume of energy, with the reduction not exceeding 30% of the forecasted total consumption. A change in volume will not result in additional costs beyond settlement for actually consumed energy. Changes in the number of electricity consumption points (PPE) are allowed within the limits specified in § 5(8) of the contract template. The Contracting Authority has photovoltaic micro-installations with a total capacity of 118.8 kWp at 6 PPE points. It reserves the right to change the number or capacity of micro-installations at PPE points, while their total capacity will not decrease. The Contracting Authority will conclude an agreement for the repurchase of electricity generated in photovoltaic micro-installations using the template proposed by the contractor, after its acceptance by the Contracting Authority, in accordance with § 29(5) of the SWZ. The contractor is responsible for the commercial balancing of energy generated in photovoltaic installations. The risk and costs of energy imbalance are borne by the contractor. The recipients indicated in Annexes No. 7a–7k to the SWZ have electricity sales agreements valid until 31 December 2026 and separate agreements for the provision of transmission services concluded for an indefinite period. The Distribution System Operator is PGE Dystrybucja S.A. Oddział Lublin, ul. Garbarska 21A, Lublin. The Contracting Authority will authorize the contractor to carry out the seller change procedure and submit sales agreement notifications on behalf of the Contracting Authority, based on appropriate powers of attorney. By concluding the electricity sales agreement, the Contracting Authority indicates the contractor as the entity responsible for commercial balancing on the balancing market. The risk and costs of energy imbalance are borne by the contractor. The Contracting Authority will use the rights resulting from the provisions on electricity price limitation, if such provisions are in force during the contract implementation period and cover the Contracting Authority. The contractor undertakes to apply these provisions in settlements by operation of law, without the need to amend the agreement. Detailed conditions for the implementation of the contract in terms of electricity sales and purchase are specified in Annex No. 7 to the SWZ – contract template.

Closes 16 Nov 2026

General renovation with energy-related measures for the town hall location Münchner Straße 70 in Unterföhring and the underground car park located there, with the following main objectives: - Redesign of office and workspace areas (also with regard to the most flexible usage concepts possible) and creation of a room book designed to be as flexible as possible; there is already a room concept for this, which was originally intended for a new building. - Due to the change in framework conditions, the new building will not be realised by the municipality. However, the room concept should be largely adopted into the new room book to be created, as far as this is possible without additional costs. - Currently there are 84 workplaces in the building. These are to be increased to a minimum of 90 workplaces. - Creation of common rooms and social rooms for the municipal staff. - Creation or improvement of accessibility and reachability of the individual offices. The municipality comprises a total of six offices, four of which primarily fulfil public law tasks during public office hours. - Implementation of 5 faction rooms and 2 meeting rooms - 1 large meeting room for 24 municipal council members, administration, press and citizens - 1 small meeting room for 9 committee members, administration and possibly citizens - Implementation of an energy-efficient renovation according to currently applicable legal standards - Fire protection upgrading of the building, in particular creation of a structural second escape route for the entire building

Closes 25 Nov 2026Budget€8.2M

The acquisition consists of providing a complete data center, together with associated services, necessary for the implementation of the investment project "Backup data center for the acquisition and publication of process data", as follows: 1) Supply of products 2) Design services 3) Installation and configuration services The number of days until clarifications can be requested before the deadline for submitting offers is 20 days. The contracting entity will respond clearly and completely to all requests for clarifications or additional information on the 11th day before the deadline for submitting offers. The contracting entity will only respond to clarification requests addressed by economic operators up to the established deadline. ATTENTION!!! THE CONTRACTING ENTITY WILL ONLY RESPOND TO CLARIFICATION REQUESTS ADDRESSED BY ECONOMIC OPERATORS UP TO THE ESTABLISHED DEADLINE (20 DAYS BEFORE THE DEADLINE FOR SUBMITTING OFFERS)

Closes 23 Nov 2026BudgetRON 3.5M

The subject of the contract is the supply of electricity to 35 consumption points in Kostrzyn nad Odrą

Closes 16 Nov 2026

The subject of the order is the supply and repurchase of electricity in accordance with applicable regulations, quality standards of the Energy Law and implementing regulations, in particular the Regulation of the Minister of Climate and Environment of March 22, 2023 on the detailed conditions for the functioning of the power system for subject points of consumption participating in the proceedings, the list of which is included in the Specification of the Terms of the Order.

Closes 17 Nov 2026BudgetPLN 31.8M

Acquisition of "Varian linear accelerator upgrade" according to the specifications in the Statement of Work

Closes 18 Nov 2026BudgetRON 6.9M

1. The subject of the order is a comprehensive supply of electricity – supply together with distribution service – in the period from 01.01.2027 to 31.12.2027 – to 61 points of consumption (PPE), described in detail in Annex No. 1 to the SWZ (List of PPE), with an estimated volume of 1,527,810 kWh. 2. The Contracting Authority clarifies that for some PPE, the information is incomplete because the facilities are in the process of being connected. 3. The above data is indicative. The amount of electricity has been estimated based on historical data on electricity consumption for a period of 12 months and taking into account the actions taken, as referred to in Article 37 of the Act of October 7, 2022, on special solutions serving the protection of electricity consumers in 2023 and 2024 in connection with the situation on the electricity market, taking into account electricity generated in Micro-installations and used by Prosumers (estimated self-consumption). The Contractor should take into account possible fluctuations in electricity consumption. A decrease or increase in the amount of electricity does not entail any consequences for the contracting authority (recipients), apart from the necessity to pay for the actually consumed amount of energy and transmission services in accordance with the applicable DSO Tariff. The indicated estimated amount of energy is the amount that the contracting authority intends to purchase and does not include energy produced on its own and consumed as part of self-consumption or taken from the DSO network with a discount. 4. The procedure covers PPE with generation installations – a detailed description (installation power, connection date, billing method) is included in Annex No. 1 to the SWZ. In all PPE with PV installations, recipients have the status of Prosumer and settle accounts in the net billing or net-metering system – as described in Annex No. 1 to the SWZ. 5. Settlement in the net-metering system The Contractor will settle the amount of electricity introduced into the DSO network against the amount of electricity taken from this network for its own use by the Prosumer generating electricity in a micro-installation with a total installed electrical power: 1) greater than 10 kW – in a quantitative ratio of 1 to 0.7 2) not greater than 10 kW – in a quantitative ratio of 1 to 0.8. 6. Settlement in the net-billing system 1) The value of electricity will be determined in accordance with the provisions of Article 4b of the RES Act 2) The Contractor, in order to conduct settlements according to the net-billing system, will maintain an account for the Prosumer of renewable energy, on which the amount of electricity and the value of electricity, as well as the resulting value of funds due to the Prosumer for electricity introduced into the network – Prosumer Deposit – will be recorded. The amount of funds constituting the Prosumer Deposit may be settled on the prosumer account for 12 months from the date of its assignment as a Prosumer Deposit on the Prosumer's account. The amount of any overpayment (the value of electricity not used within 12 months), returned by the Contractor, will be determined based on the regulations in force at the time of settlement. 7. The Contracting Authority is obliged to inform the contractor about changes affecting the method of conducting settlements, in particular about the loss of Prosumer status, changes in the total installed electrical power of the micro-installation, the type of energy source in the micro-installation, permanent disconnection of the micro-installation from the DSO network, within 14 days from the date of change. 8. Due to the specificity of the subject of the order, the contracting authority will apply one criterion for evaluating offers – price. 9. Quality standards: 1) The subject of the order is the supply of electricity with specified quality standards, in accordance with applicable regulations. 2) The quality standards of electricity are described in the Electricity Act and in the Regulation of the Minister of Climate and Environment of March 22, 2023, on the detailed conditions for the functioning of the power system (i.e. Journal of Laws 2025 item 919). 3) The rules for shaping and calculating tariffs and settlements in electricity trading are specified in the Regulation of the Minister of Energy of September 3, 2026, on the method of shaping and calculating tariffs and the method of settlements in electricity trading (Journal of Laws 2026 item 1182). 4) Standards regarding electricity distribution are contained in the Operator's Tariff, which specifies: • tariff groups and detailed criteria for qualifying recipients to these groups; • the method of determining connection fees to the Operator's network, and in the case of connection to a network with a nominal voltage not exceeding 1 kV, also lump-sum fees; • rates for providing distribution services and conditions for their application, including a breakdown into rates resulting from: • electricity distribution (variable and fixed network rate components), • use of the national power system (quality rates), • reading of measurement and billing systems and their ongoing control (subscription rates), • early termination of long-term contracts (transitional fee rates), • ensuring the availability of electricity from renewable sources in the national power system (RES fee rate), • ensuring medium- and long-term security of electricity supply to end-users (capacity fee rate); • the method of determining bonuses for non-compliance with electricity quality parameters and customer service quality standards; • the method of determining fees for: - excess reactive power consumption, - exceeding contracted power, - illegal electricity consumption, • fees for services performed at the additional request of the recipient; • fees for resuming electricity supply after its suspension.

Closes 10 Nov 2026

Within a scope of international technical assistance project the State Emergency Service of Ukraine (SESU) will be supplied with modern electronic personal dosimeters to be used by SESU personnel in case of nuclear and radiological emergencies.

Closes 12 Nov 2026BudgetNOK 6.5M

The subject of the order is the supply of a complete demonstration energy storage installation using hydrogen technology (hereinafter referred to as the “Energy Storage Installation”), including design, supply of devices, assembly, integration, commissioning, and necessary accompanying works and services. The requirements for the Energy Storage Installation are specified in Annex No. 4 to the SWZ – Functional and Utility Program (hereinafter referred to as “FUP”). The purpose of the Energy Storage Installation is to produce hydrogen from electricity coming exclusively from RES sources, store it, and then convert the stored energy into electricity, enabling the demonstration and operation of the system in real conditions. The primary location of the Energy Storage Installation is ul. Torowa 12, 16-100 Sokółka, plot no. 3203/25, Sokółka district. The Contracting Authority allows for a change of the location of the entire hydrogen installation to another property at its disposal, within the Sokółka county and permitted by the KPO project documentation. The change cannot lower the parameters of the FUP and the Offer, change the function or the general nature of the order. The entire Energy Storage Installation must be integrated into a mobile container structure, meeting applicable transport standards. The supply and assembly of RES sources, including a photovoltaic installation, are not the subject of this order. The Contractor ensures full energy, functional, measurement, and control integration of the Energy Storage Installation with an existing or implemented RES source as part of a separate task. Energy used for hydrogen production, also through BESS supporting this process, must come exclusively from RES sources. On-grid mode does not allow the use of energy taken from the grid to power the electrolyzer for hydrogen production. The purpose of the order is to create a fully functional pilot installation, enabling practical evaluation of the operation of the hydrogen energy storage system, verification of its technical parameters, and analysis of the effectiveness of integrating hydrogen technologies with the local energy infrastructure. The order will be carried out on a “turnkey” basis and includes all works necessary to achieve full operational readiness of the installation, including assembly works, commissioning, functional tests, and handover of complete technical documentation.

Closes 10 Nov 2026

Supply and installation of a 600 MHz nuclear magnetic resonance (NMR) spectrometer for liquid samples, intended for the Research Support Service (SAI) of the University of La Rioja.

Closes 09 Nov 2026Budget€949,405.7

The present call for tenders aims to award a Framework Contract for the provision of research and consulting services in the form of study in the field of Nuclear Technologies for EU Defence Energy Systems. The general objective of this procurement is to ensure contractual support aimed at addressing emerging questions related to advanced nuclear technologies, defence energy resilience, energy security and the protection of critical energy infrastructure. In order to achieve the objectives of this procurement, EDA intends to award a Framework Contract comprising the following tasks/activities: studies, assessments, expert consultations, workshops and analytical activities related to advanced nuclear technologies, defence energy resilience, energy security, the protection of critical energy infrastructure, regulatory and licensing frameworks, fuel supply considerations, implementation pathways, cyber, hybrid and physical security aspects, and capability development activities.

Closes 16 Nov 2026Budget€900,000.0

Public contract concerning the provision of technical services relating to feasibility studies and operational safety with a view to the disposal of Category B and C waste.

Deadline unavailable

1. The contracting authorities described in Chapter I of the SWZ are jointly conducting a public procurement procedure (Article 38 of the Public Procurement Law), with the authorized Contracting Authority - the Leader of the Purchasing Group being the City of Gorzów Wielkopolski. 2. The subject of the contract is the supply of electricity in the period from 01.01.2027 to 31.12.2027. The contract will be awarded in three parts. The contractor may submit an offer for any number of parts: 1) Part 1 of the contract - Supply of electricity to premises and facilities - other tariff groups 2) Part 2 of the contract - Supply of electricity to premises and facilities - tariff group B 3) Part 3 of the contract - Supply of electricity for street lighting purposes. A detailed description of each part of the contract can be found in Chapter III.1, III.2, III.3 of the SWZ. The contracting authority does not have aggregated daily and hourly data. 3. Data on the quantity of electricity to be purchased are indicative. The quantity of electricity has been estimated based on historical data on electricity consumption over a 12-month period, taking into account planned changes in use and actions taken by contracting authorities, as referred to in Article 37 of the Act of 7 October 2022 on special solutions serving the protection of electricity consumers in 2023 and 2024 in connection with the situation on the electricity market and the estimated quantity of electricity generated in generation installations. The contractor should take into account possible fluctuations in electricity consumption. A decrease or increase in the quantity of electricity does not entail any consequences for the contracting authorities (consumers), apart from the necessity to pay for the actually consumed quantity of electricity and distribution services in accordance with the applicable DNO Tariff. The indicated estimated quantity of energy is the quantity that the contracting authorities intend to purchase, taking into account the quantity of electricity produced in-house and consumed for self-consumption.

Closes 09 Nov 2026

1. The subject of the order is the supply of active electrical energy for Mazowiecki Port Lotniczy Warszawa-Modlin Sp. z o.o., which will take place under the conditions specified by the provisions of the Act of April 10, 1997, Energy Law (Journal of Laws 2026.43), hereinafter referred to as the "Energy Law", issued on its basis of applicable regulations, in accordance with the principles specified in the concessions, provisions of the Supply Agreement, conditions contained in this Specification of Order Conditions (hereinafter SWZ) and any clarifications provided by the Contracting Authority during the tender procedure. Mazowiecki Port Lotniczy Warszawa-Modlin Sp. z o.o. is a final recipient within the meaning of the Energy Law. 2. The estimated amount of energy to be supplied during the contract period in B23 tariffs for two PPE points is 7,500.00 MWh. 3. In accordance with Art. 433 point 4 of the Public Procurement Law, the Contracting Authority guarantees the execution of the order at a level not less than 85% of the estimated volume of electricity indicated in paragraph 2. 4. The Contractor will be obliged, at the latest before the commencement of deliveries and in accordance with the procedures of the Energy Law, to sign an agreement with the relevant DSO. 5. The above volume is calculated based on estimated and forecasted consumption.

Closes 13 Nov 2026

Execution of a global and integrated action on the municipal outdoor public lighting installations described in the PPTP, through the energy services modality by an Energy Services Company (hereinafter ESE) which includes the transfer of the use and operation of the described installations in order to reduce energy consumption, light pollution and the production of greenhouse gases through the development of the services included in the technical specifications.

Closes 11 Nov 2026Budget€7.9M

The subject of the contract is the supply of electricity to the electricity consumption points of the Contracting Authority on the terms specified in the Act of 10 April 1997, Energy Law (Journal of Laws of 2026, item 43, as amended), hereinafter referred to as the “Energy Law Act” and executive acts issued on its basis, with specified quality standards. The quality standards of electricity are described in the Energy Law Act, in the Regulation of the Minister of Climate and Environment of 22 March 2023 on the detailed conditions for the functioning of the power system (Journal of Laws of 2025, item 919, as amended), in the Regulation of the Minister of Energy of 3 September 2026 on the method of shaping and calculating tariffs and the method of settlements in electricity trading (Journal of Laws of 2026, item 1182).

Closes 06 Nov 2026