For suppliers

Tender monitoring

The planned building consists of halls for the sewage sludge upcycling plant and an administration building. The hall is an L-shaped structure with a total length of 60.00 m and a width of 40.10 m. The hall is on the ground floor. The northern part of the hall, where deliveries are housed, is partially basemented. The ridge height of the monopitch roof is approx. 11.12 m. The long side of the hall has a monopitch roof height of approx. 16.20 m. A pellet heating system is located in the south-western part of the hall. The hall will be constructed in reinforced concrete skeleton construction with a roof structure made of wooden trusses with sandwich panels. The total gross floor area of the hall is 1,642 m². The administration building is located in the southwest of the hall and is separated by a fire wall. The administration building consists of a ground floor and an upper floor. It has a length of 15.19 m and a width of 9.89 m. The entire building will be constructed in solid reinforced concrete. The roof will be a flat roof with an attic and bitumen sealing. The top floor, where common rooms are possible, is on average 3.21 m above ground level. The administration building consists of one functional unit. The gross floor area of the administration building is 151 m², height 7.00 m. The bill of quantities and the schedule are additionally referred to.

Closes 10 Nov 2026

Supply of equipment for the Clinical Rehabilitation Hospital Cluj-Napoca within the project “Investments in the infrastructure of the Clinical Rehabilitation Hospital Cluj-Napoca” – 2 lots, according to the requirements of the tender specifications. Taking into account the provisions of art. 160 of Law no. 98/2016 on public procurement: The deadline by which any economic operator interested in participating in the procurement procedure has the right to request clarifications or additional information regarding the award documentation is 18 days before the deadline for submitting offers. The contracting authority sets a single deadline by which it will respond to all requests for clarification / additional information, namely on the 11th day before the deadline for submitting offers. The deadline for responding to clarifications has been set so that economic operators have an adequate period to analyze the award documentation and, subsequently, to prepare offers based on the answers provided by the Contracting Authority.

Closes 16 Nov 2026BudgetRON 12M

The subject of the contract is the supply of electricity to the electricity consumption points of the Contracting Authority on the terms specified in the Act of 10 April 1997 on Energy Law (Journal of Laws of 2026, item 43, as amended), hereinafter referred to as the “Energy Law Act” and executive acts issued on its basis, with specified quality standards. The quality standards of electricity are described in the Energy Law Act, in the Regulation of the Minister of Climate and Environment of 22 March 2023 on the detailed conditions for the functioning of the power system (Journal of Laws of 2025, item 919, as amended), in the Regulation of the Minister of Energy of 3 September 2026 on the method of shaping and calculating tariffs and the method of settlements in electricity trading (Journal of Laws of 2026, item 1182).

Closes 06 Nov 2026

European Instrument for International Nuclear Safety Cooperation (INSC) Annual Action Plan 2026 Annex – Component A4: Türkiye – Service contract. The capacities of the Turkish nuclear regulatory authority (NDK) and its Technical Support Organization (NÜTED) are being developed in parallel with the construction of the Akkuyu Nuclear Power Plant. An ongoing INSC intervention (ending end of April 2027) is supporting regulatory framework consolidation and alignment with EU and international standards. Further support is needed to complement or follow-up the results achieved so far, in particular in regulatory areas such as nuclear safety, radiation safety and radiation protection, safe radioactive waste management, radioactive transport safety, inspection as well as the interface between safety and security.

Deadline unavailableBudget€4M

1. The subject of the contract is the supply of electricity, in accordance with the provisions of the Act of 10 April 1997, Energy Law (Journal of Laws of 2026, item 43 as amended), hereinafter referred to as EL, by the Contracting Authority to its buildings and its infrastructure, in accordance with the possessed legal titles. This contract does not include electricity distribution services. 2. The Contractor is obliged to perform the contract on the principles and conditions described in the model contract constituting Appendix No 3 to the SWZ. 3. A detailed description of the subject of the contract is contained in Appendix No 4 to the SWZ, quantities are contained in Appendix No 1 to the SWZ.

Closes 09 Nov 2026

The proposed procurement concerns the design, production, and delivery of a custom beta/gamma shielding window for the JRC Karlsruhe. This component is required to enable safe visual monitoring of operations in a high-radiation environment while preserving the shielding integrity of the hot cell. As this is a specialised component designed for nuclear applications, it is not an off-the-shelf item and must be specifically engineered for the installation.

Closes 09 Nov 2026

1. The subject of the order is: • Effective execution of the seller change process (by January 1, 2027). The Contracting Authority will grant an appropriate power of attorney to report, on behalf of the Contracting Authority, the concluded electricity sales agreement to the distribution system operator (hereinafter also referred to as "DSO") and to perform actions necessary to carry out the seller change process with the DSO. • Uninterrupted sale of electricity to the Contracting Authority from January 1, 2027, to December 31, 2027, to the facilities of BWiK "WOD-KAN" Sp. z o.o. – points of energy consumption (hereinafter also referred to as PPE). • Purchase from the Contracting Authority, from January 1, 2027, to December 31, 2027, of electricity generated by the Contracting Authority and fed into the distribution system operator's (DSO) grid, along with the provision of commercial balancing services for electricity fed into the DSO grid.

Closes 06 Nov 2026

The specific objectives of implementing the scanning and optical inspection equipment are: • performing automatic and non-destructive inspection of bipolar plates and other analyzed components; • identifying and evaluating manufacturing defects, contaminations and geometric deviations; • increasing the precision and efficiency of quality control processes; • reducing the time required for verification and analysis activities; • providing data and technical information necessary for optimizing manufacturing processes and developing new technological solutions in the field of hydrogen. Response schedule for clarification requests According to art. 160 and art. 161 of Law 98/2016, economic operators have the right to request clarifications or additional information regarding the award documentation, respecting the deadline set by the contracting authority in the participation announcement. Number of days until economic operators can request clarifications before the deadline for submitting offers: 20 days. The contracting authority will respond to any clarification request, clearly, completely and unambiguously 11 days before the deadline for submitting offers.

Closes 12 Nov 2026BudgetRON 861,675.0

The G.6/Metro Target Preparation Group needs to characterize the targets it produces. A scanning electron microscope (SEM) would be a very useful addition. It must be build into a glovebox since it will be used for radioactive material, a small model (desktop model) is preferable.

Closes 09 Nov 2026Budget€300,000.0

Purchase and delivery of specialist equipment constituting the equipment of prophylactic stations for the National Health Fund as part of the project “Coordinated care in Primary Health Care” (project number: FERS.04.15-IP.07-003/23)1”

Closes 10 Nov 2026BudgetPLN 701,030.9

The multifunctional profile bending machine for the “Romanian Hydrogen and New Energy Technologies Hub - Ro-HydroHub” is a hydraulic press with front and side access to the working area (C-type or equivalent), intended for stamping, deformation, bending and pressing operations, with a maximum force of 100 tons. Clarification request response schedule According to art. 160 and art. 161 of Law 98/2016, economic operators have the right to request clarifications or additional information regarding the award documentation, respecting the deadline set by the contracting authority in the participation announcement. Number of days until economic operators can request clarifications before the deadline for submitting offers: 20 days. The contracting authority will respond to any clarification request, clearly, completely and unambiguously 11 days before the deadline for submitting offers.

Closes 18 Nov 2026BudgetRON 262,928.0

The scope of work for this package consists of the design, fabrication, testing and delivery of 33 vertical turbine pumps of various sizes and their associated drawings, data sheets, and other documentation for each of the three nuclear power plants planned for the Poland AP1000 Project. Circulating Water System (CWS) fish spray pumps and debris spray pumps remove fish and debris from traveling screens. There are 6 total CWS debris spray pumps (2 x 100% per unit) with a rated flow of 1662 m3/hr and pump head of 77.2 m. There are 6 total CWS fish spray pumps (2 x 100% per unit) with a rated flow of 1200 m3/hr and pump head of 50.4 m. CWS plant cooling pumps supply water to heat exchangers. There are 6 total CWS debris spray pumps (2 x 100% per unit) with a rated flow of 1.1 m3/s and pump head of 42 m. Raw Water System (RWS) pumps transfer water to the desalination plant. There are 3 total RWS pumps (1 x 100% per unit) with a rated flow of 1291 m3/hr and pump head of 46 m. There are 6 total Service Water System (SWS) service water pumps (2 x 100% per unit during normal operation, 2x50% during shutdown) with a rated flow of 2643.8 m3/hr and pump head of 61.5 m. The SWS fish/debris spray functions are combined into 1 pump, and there are 6 total SWS spray pumps (2 x 100% per unit) with a rated flow of 600 m3/hr and pump head of 77.5 m. The design life of all pumps is 60 years. There shall be factory performance tests (shop performance testing) on the pumps. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual quantities and dimension numbers will be included in official bid package. PL: Zakres prac dla tego pakietu obejmuje projektowanie, produkcję, testowanie oraz dostawę 33 pionowych pomp wirowych odśrodkowych o różnych rozmiarach, wraz z powiązanymi rysunkami, arkuszem danych oraz inną dokumentacją dla każdego z trzech bloków elektrowni jądrowych planowanych w ramach projektu Poland AP1000. Pompy służące do spłukiwania ryb (fish spray pumps) oraz zanieczyszczeń (debris spray pumps) systemu wody obiegowej (Circulating Water System, CWS) służą do spłukiwania ryb i zanieczyszczeń z ruchomych krat wlotowych. Łącznie przewidziano 6 pomp wody do spłukiwania zanieczyszczeń CWS (2 × 100% na każdy blok), o wydajności nominalnej 1662 m³/h i wysokości podnoszenia 77,2 m. Łącznie przewidziano 6 pomp wody do spłukiwania ryb CWS (2 × 100% na każdy blok), o wydajności nominalnej 1200 m³/h i wysokości podnoszenia 50,4 m. Pompy systemuwody chłodzącej CWS dostarczają wodę do wymienników ciepła. Łącznie przewidziano 6 pomp systemu wody chłodzącej CWS (2 × 100% na każdy blok), o wydajności nominalnej 1,1 m³/s i wysokości podnoszenia 42 m. Pompy systemu wody surowej (Raw Water System, RWS) tłoczą wodę do instalacji odsalania. Łącznie przewidziano 3 pompy RWS (1 × 100% na każdy blok), o wydajności nominalnej 1291 m³/h i wysokości podnoszenia 46 m. Łącznie przewidziano 6 pomp wody technologicznej systemu Service Water System (SWS) (2 × 100% na każdy blok podczas normalnej eksploatacji, 2 × 50% podczas postoju), o wydajności nominalnej 2643,8 m³/h i wysokości podnoszenia 61,5 m. Funkcje spłukiwania ryb i zanieczyszczeń w systemie SWS zostały połączone w jednej pompie. Łącznie przewidziano 6 pomp wody systemu SWS (2 × 100% na każdy blok), o wydajności nominalnej 600 m³/h i wysokości podnoszenia 77,5 m. Projektowany okres eksploatacji wszystkich pomp wynosi 60 lat. Dla pomp wymagane będzie wykonanie: • fabrycznych testów wydajności (shop performance testing). UWAGA: Powyższe ilości i wymiary mają charakter wyłącznie przybliżony. Ich celem jest jedynie przedstawienie oferentom skali projektu. Rzeczywiste ilości oraz wymiary zostaną podane w oficjalnym pakiecie przetargowym (bid package).

Deadline unavailable

Public contract concerning the provision of technical services relating to feasibility studies and operational safety with a view to the disposal of Category B and C waste.

Deadline unavailable

Three hand - and foot monitors including accessories, services and maintenance and an additional three optional monitors including accessories, services and maintenance. The latter does not constitute a guaranteed purchase volume.

Closes 11 Nov 2026Budget€375,000.0

“SUPPLY OF VARIOUS RADIOPHARMACEUTICAL AND HORMONAL MEDICINES”, 9 LOTS The supplier will deliver the products by the deadline specified in the contract, in the quantities requested by the contracting authority and having the minimum characteristics/specifications specified in the tender book. Pursuant to the provisions of art. 160 of Law 98/2016, amended by GEO 107/2017, economic operators interested in the procedure will request clarifications or additional information regarding the award documentation 20 days before the deadline set for submitting offers, and pursuant to art. 161 of Law 98/2016, amended by GEO 107/2017, the contracting authority's response will be sent on the 11th day, before the deadline set for submitting offers.

Closes 11 Nov 2026BudgetRON 9.5M

Masonry and plastering work as well as fire protection-related and concrete repair work in the buildings of the JRC Karlsruhe according to the present specification

Closes 11 Nov 2026Budget€1.3M

Porvoo's Kokonniemi sports park will expand significantly between 2027 and 2030. A new ice rink with two rinks, a multi-purpose arena with lobby facilities, and a new heated artificial turf field with service buildings will be built in the area. The current ice rink will be demolished, and the existing building stock and the current heated artificial turf will remain in the area. The client will acquire a regional energy system for the area using a service model: the supplier designs, invests in, builds, owns, and operates energy production and a regional low-temperature network, and supplies heating and cooling to the area's facilities with the offered service and energy fee for the duration of the contract period. The supplier's energy production system will fully cover the area's heating and cooling energy needs. The objective of the procurement is: - a high proportion of renewable and locally produced energy. Supplementary heating method according to the supplier's proposal. - the waste heat from the ice rinks' track cooling is primarily utilized in the property. The supplier may utilize surplus condensation heat, which will be specified during negotiations. - predictable and competitive life cycle costs for the client - certainty of energy supply for the area being completed in phases - fulfillment of the RTYL targets set for the project area - one responsible party for the production of heating and cooling in the area The subject of the procurement is the construction of an energy system and the supply of thermal energy for the duration of the contract period to the client's facilities: - Ice rink (completion 2028) - Lobby and multi-purpose arena (completion 2030) - Current heated artificial turf field (heating starts autumn 2028) OPTION: The regional energy procurement includes as an option a new heated artificial turf field to be implemented south of the area, with an area of approximately 9,000 m², and a service building to be built in connection with the field area, with an area of approximately 400 m². If the client exercises the option, the supplier commits to implementing the energy solution for the artificial turf field and service building as part of the regional energy system. The supplier must consider the energy needs and connectivity of the optional targets to the energy solution already at the bidding and dimensioning stage. The preliminary target schedule for the optional targets is as follows: - Construction of the service building will start in 2027, and the building is intended to be commissioned in 2028. - Construction of the heated artificial turf field will start with preliminary construction work in 2027. The goal for commissioning the field is the beginning of the 2029 playing season. The schedules are preliminary and will be specified in connection with the further planning of the project. The service provider must be prepared to implement the energy solutions for the optional targets according to the target schedule described above. See procurement documents for more details.

Deadline unavailableBudget€10M

The municipality of Mettlach and Saarschleife Touristik GmbH & Co. KG intend to conclude electricity and gas supply contracts for the year 2027, optionally also for the year 2028.

Closes 06 Nov 2026Budget€1.0