The MaresConnect Project is a proposed 750 MW, 320 kV High Voltage Direct Current (HVDC) electricity interconnector linking Denbighshire, Wales and North County Dublin, Ireland. Developed by MaresConnect Limited, a joint venture between Foresight Group Holdings Ltd and Etchea Energy Nominees Ltd, the project will transmit electricity via approximately 240 km of subsea and underground cables between new converter stations on each side. It aims to enhance security of supply, market integration, and renewable energy utilisation between the Irish and GB grids. MaresConnect shall utilise Voltage Source Converter (VSC) technology and the configuration shall be a Symmetrical Monopole. The rated DC voltage shall be +/-320 kV. The link shall be bi-directional and shall have a rated power (receiving end) of 750 MW. The project is being procured as separate EPC (Turnkey) contracts, divided into four lots: LOT 1A: EPC for two HVDC Converter Stations; LOT 1B: EPC for one Irish 400kV AC Tail Substation; LOT 2A: EPC for the HVDC subsea and underground cable system, and for the HVAC underground cable system in Wales (Bodelwyddan); LOT 2B: EPC for the supply and installation of HVAC cable system in Ireland (Dublin). The contract model for the lots will be amended FIDIC Conditions of Contract for EPC/Turnkey Projects (Silver Book). MaresConnect has conducted Preliminary Market Engagement prior to publication of this Contract Notice and encourages further collaboration between OEMs and Construction Contractors to establish bidding arrangements in time for the next step of the Procurement Process (notably the Pre-Qualification Questionnaire).
1. The subject of the order is the Sale of electricity for the needs of the facilities of Tarnogórski Ośrodek Sportu i Rekreacji Spółka z o.o. in Tarnowskie Góry, ul. Obwodnica 8 in 2027, together with distribution in accordance with the operator's tariff. 2. Estimated quantity: 2100 MWh (2,100,000 kWh) The estimated quantity of ordered energy is only indicative (estimated) for the purpose of comparing submitted offers, and in no case constitutes an obligation on the part of the Contracting Authority to purchase energy in the specified quantity. The actual quantity of electricity supplied will result from the current readings of the metering and billing systems, the point of consumption, and may decrease or increase due to the actual consumption of electricity. The Contractor will not be entitled to any claim against the Contracting Authority due to the non-collection of the contractual quantity of energy foreseen in point 1. Settlement for the supply of electricity will take place based on the actual quantities of electricity consumed in accordance with the unit prices specified in the Offer Form submitted by the Contractor. The Contracting Authority informs that it will grant the Contractor all powers of attorney and provide the Contractor with the necessary information and documents after selecting the most advantageous offer or concluding the contract, in each case, if it is necessary for the proper performance of the public procurement contract. Also for carrying out all necessary actions to change the electricity supplier. Electricity should be supplied 24 hours a day to the point of consumption. Points of Consumption: 1. 590322400800588091 – Sports Hall ul. Obwodnica 8, 42-600 Tarnowskie Góry Tariff Group: C21 Contractual power: 110 kW 2. 590322400800299737 – Water Park Reserve Supply ul. Obwodnica 8, 42-600 Tarnowskie Góry Tariff Group: B23 Contractual power: 265 kW 3. 590322400800042104 - Water Park Basic Supply ul. Obwodnica 8, 42-600 Tarnowskie Góry Tariff Group: B23 Contractual power: 386 kW 4. 590322400800883332 – Wastewater flow meter ul. Obwodnica Dz. 1125/3, 42-600 Tarnowskie Góry Tariff Group: G11 Contractual power: 2 kW
Framework agreement for the supply of 99m Tc Generator and radiopharmaceutical kits according to the specifications in the tender book, which is an integral part of the award documentation and constitutes the set of requirements on the basis of which each bidder prepares the technical proposal. Number of days until clarifications can be requested before the deadline for submission of offers/candidatures: 18 days before the deadline for submission of offers specified on SEAP. Deadline for submitting a response to clarification requests: on the 11th day before the deadline for submission of offers specified on SEAP, according to art. 160, para. 2 and art. 161 of Law 98/2016 amended by GEO 107/2017.
Nuclear propulsion technologies for ships, investigating the feasibility of zero-emission, long-endurance power for large-scale vessels backing a very relevant line of work at the IMO that is due to overhaul the regulations for nuclear powered ships.
The MaresConnect Project is a proposed 750 MW, 320 kV High Voltage Direct Current (HVDC) electricity interconnector linking Denbighshire, Wales and North County Dublin, Ireland. Developed by MaresConnect Limited, a joint venture between Foresight Group Holdings Ltd and Etchea Energy Nominees Ltd, the project will transmit electricity via approximately 240 km of subsea and underground cables between new converter stations on each side. It aims to enhance security of supply, market integration, and renewable energy utilisation between the Irish and GB grids. MaresConnect shall utilise Voltage Source Converter (VSC) technology and the configuration shall be a Symmetrical Monopole. The rated DC voltage shall be +/-320 kV. The link shall be bi-directional and shall have a rated power (receiving end) of 750 MW. The project is being procured as separate EPC (Turnkey) contracts, divided into four lots: LOT 1A: EPC for two HVDC Converter Stations; LOT 1B: EPC for one Irish 400kV AC Tail Substation; LOT 2A: EPC for the HVDC subsea and underground cable system, and for the HVAC underground cable system in Wales (Bodelwyddan); LOT 2B: EPC for the supply and installation of HVAC cable system in Ireland (Dublin). The contract model for the lots will be amended FIDIC Conditions of Contract for EPC/Turnkey Projects (Silver Book). MaresConnect has conducted Preliminary Market Engagement prior to publication of this Contract Notice and encourages further collaboration between OEMs and Construction Contractors to establish bidding arrangements in time for the next step of the Procurement Process (notably the Pre-Qualification Questionnaire).
With the integration of new municipalities in recent years, the union has seen its workforce increase, requiring more suitable infrastructure. This is the case for the CTS premises. Indeed, the current CTS premises have several dysfunctions. The building is not scalable, the premises cannot accommodate new skills and the increase in staff. The current organization is not functional. The spaces are uncomfortable, not very bright, have poor insulation and are therefore not adapted to working practices. It is in this context that SIARP wishes to demolish the existing and rebuild a new building showcasing its activities, with workspaces compliant with regulations and ergonomic while developing environmental themes
The MaresConnect Project is a proposed 750 MW, 320 kV High Voltage Direct Current (HVDC) electricity interconnector linking Denbighshire, Wales and North County Dublin, Ireland. Developed by MaresConnect Limited, a joint venture between Foresight Group Holdings Ltd and Etchea Energy Nominees Ltd, the project will transmit electricity via approximately 240 km of subsea and underground cables between new converter stations on each side. It aims to enhance security of supply, market integration, and renewable energy utilisation between the Irish and GB grids. MaresConnect shall utilise Voltage Source Converter (VSC) technology and the configuration shall be a Symmetrical Monopole. The rated DC voltage shall be +/-320 kV. The link shall be bi-directional and shall have a rated power (receiving end) of 750 MW. The project is being procured as separate EPC (Turnkey) contracts, divided into four lots: LOT 1A: EPC for two HVDC Converter Stations; LOT 1B: EPC for one Irish 400kV AC Tail Substation; LOT 2A: EPC for the HVDC subsea and underground cable system, and for the HVAC underground cable system in Wales (Bodelwyddan); LOT 2B: EPC for the supply and installation of HVAC cable system in Ireland (Dublin). The contract model for the lots will be amended FIDIC Conditions of Contract for EPC/Turnkey Projects (Silver Book). MaresConnect has conducted Preliminary Market Engagement prior to publication of this Contract Notice and encourages further collaboration between OEMs and Construction Contractors to establish bidding arrangements in time for the next step of the Procurement Process (notably the Pre-Qualification Questionnaire).
Acquisition of medical equipment, 9 lots. Suspensive clause (Lots 1-7): “The public procurement award procedure is initiated under the incidence of this suspensive clause, in the sense that the conclusion of the public procurement contract is conditional on the allocation of budgetary credits for this purpose, the signing of the contract being carried out in compliance with the provisions regarding the commitment of expenditures from budgets falling under the incidence of public finance legislation. Given the provisions of Law 98/2016 on public procurement and Government Decision no. 395/2016, with subsequent amendments and completions, the Contracting Authority specifies that it will conclude the contract with the declared winning tenderer only to the extent that the necessary funds for the acquisition will be ensured by the allocation of budgetary credits for this purpose. In the event that, regardless of the reasons, the budgetary credits are not allocated, for a period of 18 months from the date of approval of the procedure report, the award procedure will be cancelled by right, if there is no other source of financing, in accordance with the provisions of art. 212 para. (1) letter c) second sentence of Law 98/2016 with subsequent amendments and completions, making it impossible to conclude the public procurement contract. The tenderers in this procedure understand that the Contracting Authority cannot be held liable for any damage in the event of the cancellation of the award procedure, regardless of its nature and regardless of whether the Contracting Authority has been notified of the existence of such damage. The tenderers in this procedure accept the use of the above special conditions/suspensive clause, assuming full responsibility for any damages they may suffer in the described situation. The maximum period for which the suspensive clause operates is 18 months, so that, if the condition regarding the provision of financing is not met, the award procedure is cancelled. Number of days until clarifications can be requested before the deadline for submission of offers/candidatures: 18. Number of days until clarifications will be answered before the deadline for submission of offers/candidatures: 11.
The Repro system is managed by Achilles South Europe, S. L. U. on behalf of the entities listed in section VI.3. These entities confirm that they will use Repro as a common system for the registration of their suppliers, providers and contractors which is managed and administered by Achilles South Europe, S. L. U. This announcement describes the products, services and works for which they may use Repro when a need arises in relation to them. To find out all the categories of products and services included in the repro code, you can request the code of products and services to the address indicated in section I.1. The aforementioned entities may use Repro to contract all the products, services and works contemplated in Royal Decree-Law 3/2020, of 4.2.2020, which transposes into Spanish law the Directive Directive 2014/25/EU on procurement by entities operating in the water, energy, transport and postal services sectors (hereinafter, Royal Decree-Law 3/2020), under the terms and conditions set out therein.
Power Purchase Agreement (PPA) for the supply of (wind) energy
Public contract concerning the provision of technical services relating to feasibility studies and operational safety with a view to the disposal of Category B and C waste.
The Department of Radiation Protection, Chemistry and Physics at NND, abbreviated NUKH SFK, is responsible for ensuring the safety of the personnel against exposure to harmful radiation in the nuclear facilities at the NND Halden reactor site. The radiation protection monitoring procured in this procurement will be used to continuously monitor the site. The procurement consists of four different types of monitoring equipment systems, and it is possible for the supplier to submit a offer for one, several or all types of monitoring equipment systems. The following types of monitoring equipment are subject for purchase in this procurement: • Airborne Particulate Radioactivity Monitors • Gamma Radiation Monitors • Kr-85 Gas Monitors • Waterborne Particulate Radioactivity Monitors This means that this procurement consists of four different monitoring equipment systems, regulated by four different separate contracts.
The offer includes the following tasks: Support for project and schedule coordination, quality control and document management for new construction and renovation projects in the nuclear sector (laboratory building Wing M, infrastructure) at JRC Karlsruhe. This includes services during the installation phase and commissioning of new buildings as well as in preparation for the relocation and move into new buildings. For this purpose, the following work profiles are required: Project coordinator, engineers in the fields of ventilation, refrigeration-air conditioning, process engineering, electrical and control engineering, civil engineering, mechanical engineering, a welding engineer and a profile in the field of archives, library or secretarial services. A more detailed description of the type of profiles and the required qualifications will be published in the tender documents at a later stage.
Through the dynamic purchasing system for energy supply, JEN mbH covers its own energy requirements for gas and green electricity within the next 60 months. Procurement is carried out by means of individual procurement procedures (mini-competitions) in the categories concerned within the framework of "non-open procedures" in competition. The competition takes place between the qualified and approved companies in the respective categories. Terms and quantities in the mini-competitions can vary and adapt to demand and situation.
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: feed water pumps for the Feedwater System (FWS) serving three AP1000 nuclear generating units. The scope of supply is anticipated to include nine (9) feedwater pump packages, arranged as three (3) trains per unit, each rated at 3x33 % capacity. Each feedwater pump package consists of one-stage double suction booster pump, one-stage double suction main feedwater pump, one induction motor, speed increasing gear, couplings, coupling guards, lube oil system, seal system, on skid piping, on-skid instruments required for machine protection and for control of auxiliary systems. Scope of supply includes special tools, testing, documentation, quality assurance, inspection and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. PL: Zakres prac dla tego pakietu obejmuje między innymi projektowanie, produkcję oraz dostawę kompletnego i w pełni funkcjonalnego wyposażenia, obejmującego pompy wody zasilającej dla Układu Wody Zasilającej (Feedwater System, FWS) obsługującego trzy bloki jądrowe AP1000. Przewiduje się, że zakres dostawy będzie obejmował dziewięć (9) pakietów pomp wody zasilającej, skonfigurowanych jako trzy (3) ciągi technologiczne na każdy blok, z których każdy będzie posiadał wydajność równą 3 × 33 %.Każdy pakiet pompy wody zasilającej będzie obejmował jednostopniową dwustrumieniową pompę wspomagającą, jednostopniową dwustrumieniową główną pompę wody zasilającej, silnik indukcyjny, przekładnię zwiększającą prędkość obrotową, sprzęgła, osłony sprzęgieł, układ olejowy, układ uszczelnień, orurowanie zamontowane na zestawie pompowym (skidzie) oraz aparaturę kontrolno-pomiarową zamontowaną na urządzeniach w zestawie, wymaganą do ochrony urządzeń oraz sterowania układami pomocniczymi. Zakres dostawy obejmuje również narzędzia specjalne, badania i testy, dokumentację, zapewnienie jakości, inspekcje oraz usługi związane z dostawą. Urządzenia muszą być przystosowane do instalacji w budynku maszynowni, zaprojektowane do długotrwałej i niezawodnej pracy w środowisku elektrowni jądrowej oraz spełniać wymagania odpowiednich przepisów Unii Europejskiej, polskich norm i regulacji oraz właściwych standardów branżowych. UWAGA: Podane powyżej ilości i wymiary mają charakter wyłącznie orientacyjny. Ich celem jest przedstawienie oferentom przybliżonej skali przedsięwzięcia.
The subject of the order is the supply of electricity to premises/facilities used by the Contracting Authority in tariff groups B, C and G, amounting to approximately 3952 points for the needs of the Contracting Authority, as the end user, in accordance with the addresses, electricity consumption point (PPE) numbers and volume indicated in Annex 2 to the Agreement.
The RFQ document will include the scope of services on the Poland AP1000 Project. The Company shall be responsible for supplying, installing, configuring, supporting and maintaining all equipment, software, consumables and related services required to perform the scope of work. The Company shall provide qualified technical personnel, service resources and support infrastructure necessary to meet the service level requirements defined in the RFQ documents. The Company is expected to demonstrate capability to support multiple project locations, provide maintenance and technical support services, manage consumables and ensure continuity of service throughout the Project lifecycle. The Company is required to have: · ISO 9001 or equivalent certification · Seller’s activities will need to comply with Polish Law and National Standards.
Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing.
The tender covers the acquisition of educational equipment and associated supplies for the Contracting Authority's process operator training programs. The acquisitions must support teaching in circular green energy and ensure that the necessary educational facilities and technical equipment are available to meet the applicable learning objectives according to the education regulation for the process operator education. The tender is divided into six (6) sub-agreements, each covering an independent subject area or an independent delivery. Tenderers can apply for pre-qualification for one, several or all sub-agreements and can subsequently submit bids for the sub-agreements for which they are pre-qualified. The purpose of the tender is to enter into contracts with suppliers who can deliver modern, stable and future-proof solutions that support teaching, practical training and competence development within the process industry and the green transition.
The Request for Quotation (RFQ) shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool.