Closing soon704514-2026Classification pending

Design, supply, assembly, integration and commissioning of a demonstration energy storage installation using hydrogen technology as part of the project entitled: Development of the Energy Cluster of the Municipalities of Sokółka County – a demonstration project

Poland
Closes 10 November 2026 at 10:00
Overview

Machine translated from Polish.

The subject of the order is the supply of a complete demonstration energy storage installation using hydrogen technology (hereinafter referred to as the “Energy Storage Installation”), including design, supply of devices, assembly, integration, commissioning, and necessary accompanying works and services. The requirements for the Energy Storage Installation are specified in Annex No. 4 to the SWZ – Functional and Utility Program (hereinafter referred to as “FUP”). The purpose of the Energy Storage Installation is to produce hydrogen from electricity coming exclusively from RES sources, store it, and then convert the stored energy into electricity, enabling the demonstration and operation of the system in real conditions. The primary location of the Energy Storage Installation is ul. Torowa 12, 16-100 Sokółka, plot no. 3203/25, Sokółka district. The Contracting Authority allows for a change of the location of the entire hydrogen installation to another property at its disposal, within the Sokółka county and permitted by the KPO project documentation. The change cannot lower the parameters of the FUP and the Offer, change the function or the general nature of the order. The entire Energy Storage Installation must be integrated into a mobile container structure, meeting applicable transport standards. The supply and assembly of RES sources, including a photovoltaic installation, are not the subject of this order. The Contractor ensures full energy, functional, measurement, and control integration of the Energy Storage Installation with an existing or implemented RES source as part of a separate task. Energy used for hydrogen production, also through BESS supporting this process, must come exclusively from RES sources. On-grid mode does not allow the use of energy taken from the grid to power the electrolyzer for hydrogen production. The purpose of the order is to create a fully functional pilot installation, enabling practical evaluation of the operation of the hydrogen energy storage system, verification of its technical parameters, and analysis of the effectiveness of integrating hydrogen technologies with the local energy infrastructure. The order will be carried out on a “turnkey” basis and includes all works necessary to achieve full operational readiness of the installation, including assembly works, commissioning, functional tests, and handover of complete technical documentation.

Procedure
Open procedure
Notice type
Contract notice (standard)
Contract nature
Supplies
Legal basis
32014L0024
Common Procurement Vocabulary (CPV)
09300000 — Electricity, heating, solar and nuclear energy
Published
12 October 2026 at 22:00

Lots 1

Design, supply, assembly, integration and commissioning of a demonstration energy storage installation using hydrogen technology as part of the project entitled: Development of the Energy Cluster of the Municipalities of Sokółka County – a demonstration project

09300000 — Electricity, heating, solar and nuclear energy

Documents

Unlock tender documents

Sign in or register for free to view this tender information.