For suppliers
Tender monitoring
One-off purchase of radiological detectors coupled with a lifetime maintenance contract for the equipment relating to the delivery of spare parts, consumables and assemblies as well as various services including preventive, corrective and evolutionary maintenance for the benefit of the Belgian Defence and the Dutch Defence
GAMMA RADIATION MEASUREMENT PORTAL FOR VEHICLES
Procurement of equipment for decontamination of combat and non-combat material and technical means.
Framework agreement for the procurement of quick chargers for electric vehicles at Avinor ́s airports.
Framework agreement for normal chargers for electric vehicles at Avinor ́s airports in the Norwegian mainland.
The object of this Contract is to supply Electricity, provisioning and operations for the Contracting Authority (Principal). The Contracting Authority wants the Successful Tenderer to purchase and/or sell electric energy for the Contracting Authority and, if desired, purchase and/or deliver it at the connection points for which the Contracting Authority has entrusted balance responsibility to the Successful Tenderer.
Experienced and qualified companies are invited to express interest and prequalify to provide Emergency Response Services (commodity code HXYM) in support of the construction of the Poland Nuclear Power Plant. The Project will adopt a hybrid emergency response model, combining the expertise of the professional service provider with the scalable support of a volunteer Emergency Response Team (ERT) drawn from the project workforce. The service provider will supply the technical core, delivering professional leadership, developing training and Emergency Preparedness and Response Plans, and establishing the incident management framework to guide project leadership. Meanwhile, trained volunteers by the service provider from the project workforce will augment the project's overall response capacity. The Project’s Site Manager is expected to serve as Incident Commander, supported by project subject matter experts and the service provider, in accordance with the Project emergency management framework and applicable law. The service provider is expected to maintain a minimum staffing level structured to provide 24-hour professional response capability independent of volunteer availability, using a rotating 12-hour roster system (or equivalent) as detailed in the RFQ. Interested Companies must register/update their Contractor's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select commodity code HXYM as their specialty. If Contractor has any questions or intends to express interest in bidding this requirement, the Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire which Company would complete with response to Bechtel for review. Bechtel notes that previous proven experience with emergency services of similar scale and complexity will be mandatory and providing additional documentation / evidence of previous experience may be required. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in providing the emergency services in the past or current projects, (ii) safety record and compliance to quality requirements (see section 7),(iii) compliance to certification of legally mandatory requirements (including anti-corruption and sanctions), (iv) financial standing (solvency), and (v) organizational capabilities. In the event of high competitiveness of the proceedings (a large number of companies expressing interest), Bechtel reserves the right to conduct a preliminary preselection of companies for further proceedings, which demonstrate the greatest potential for performing the scope of work. Upon Bechtel’s evaluation of a response to the Poland Prequalification Questionnaire, Bechtel will notify if the Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. A Company's submission of Prequalification Questionnaire does not automatically qualify the Company to be a pre-qualified Company. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for emergency services. The Request for Quotation (RFQ) shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. The RFQ document will include the scope of services on the Poland AP1000 Project. The Company is responsible for providing fully qualified personnel to perform emergency services. Additionally, the company shall provide uniforms and equipment in accordance to scope of work. The Company is required to have: ISO 9001 or equivalent ISO 45001 or equivalent Seller’s activities will need to comply with Polish Law and National Standards. Proposals may be provided in either EURO or PLN or USD. Furthermore, the proposals will be requested as a combination of lump sum items and fixed unit rate items. Award criteria shall be based on a combination of the highest evaluated scored bidder with consideration of the following key criteria in order of relevance, together with cost, which will determine the final decision for award which will be detailed further in the Bid Document(s) and during the RFQ phase. Technical Capability Previous Proven Relevant Experience Environmental Health and Safety Performance Mobilization Schedule Compliance The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
1. Bechtel Polska seeks qualified experienced subcontractors for major civil earthwork specific to the major excavations required for power plant structures. This work involves shoring of excavation (SOE) for power plant power block structure foundations, advanced to significant depth exceeding 30m in complex ground conditions that include water bearing sand and artesian groundwater pressure. Other main power-plant structure excavations include shoring walls to be used as portals for seaward tunnels supplying/discharging cooling water for the power plant, and deep seepage cut-off walls in excess of 40m. The SOE work is to be performed at the project location for the Poland Nuclear Power Plant. Associated soil improvement (SI) required as part of the SOE system, tunnel boring machine launch and other soil improvement necessary to support loads adjacent to the excavation is also included. The work will be design-build requiring engineering design of shoring walls and soil improvement to required codes and standards, and upon approval of design, construction of the shoring system for several main power-plant structures. The scope of work includes, but is not limited to: • Design of shoring walls. Design will be in accordance with the codes and standards identified in the tender package. • Preparation of detailed construction drawings for the shoring system/soil improvement submitted for: o Approval by Bechtel Polska o Permit application/acquisition o Coordination with Owner and Permit/Regulator Authority • Preparation of submittals for approval of proposed materials, and of construction means and methods o Submittal of execution plan and schedule meeting the overall project schedule • Preparation of shop drawings as required for approvals and material fabrication/procurement • Procurement of required materials for construction of the shoring system/soil improvement • Construction of the shoring system/soil improvement in the field in accordance with: o Bechtel Polska’s requirements for subcontractors performing work on the project site, including the project safety plan and requirements regarding work hours o Subcontractor’s approved safety plan o Subcontractor’s approved quality plan o Coordination with and direction from Bechtel Polska in the field o Coordination with other subcontractors performing related work on excavation, backfilling, dewatering, and tunneling • Construction work for the SOE will require survey-layout of the work, and the other requirements as established by the work scope in the tender package, e.g. conformance with the site plan for construction stormwater/erosion-sediment control • Instrumentation and Monitoring- Shoring walls will include instrumentation for monitoring of movements during excavation. The tender package will include details on requirements for such instrumentation, e.g. inclinometers, vibrating wire piezometers to be installed in the shoring wall Design-build of the shoring/soil improvement works includes providing all required tools, equipment, labor, supervision, technical and professional services, materials, consumables, and supplies required to complete required excavation shoring/soil improvement. The detailed scope of work will be outlined in the tender package documents, including technical specifications, geotechnical data for use in design, and other contractual materials provided to the Company. Details such as environmental controls/requirements/restrictions, site access, laydown space, construction water/power, job trailer accommodation will be addressed in the tender package. Interested parties shall have documented, proven experience in successful design-build SOE/SI work on large projects in difficult ground conditions. Subcontractors that will be considered must demonstrate ability to provide equipment and crews of sufficient type and number; and proven experience with all required quality, safety and execution documentation related to completion of the work. Interested companies must register/update their Company's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select Commodity Code CE00 as their specific area of interest. Bechtel shall provide the interested party the Poland Prequalification Questionnaire where interested party would complete with response to Bechtel for review. Bechtel notes that previous proven work of similar scale and complexity (which includes completion of comparable design-build of SOE/SI in complex ground conditions) will be mandatory. Pre-qualification will include evaluation of bidders’ comparable experience on previous similar projects. Bechtel notes that previous proven work of similar scale and complexity (which includes completion of comparable design-build of SOE/SI in complex ground conditions) will be mandatory. Pre-qualification will include evaluation of bidders’ comparable experience on previous similar projects. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in furnishing SOE/SI design-build scope in the past or current projects which is equivalent or equal to the complexity of the Poland AP 1000 project, (ii) availability of new or like new rig equipment in performance of scope, (iii) acceptable safety record and compliance to quality requirements including current ISO 9001 certification, (v) compliance to certification of legally mandatory requirements, (vi) financial standing (solvency), and (vii) organizational capabilities.
The purpose is to procure and establish an integrated, circular energy system for use in the teaching of the process operator education at ZBC Roskilde. The solution must function as a learning platform, support green transition, and demonstrate circular resource utilization.
The Subject of the Procurement Contract includes personnel consulting services consisting in acquiring, assessing and recommending candidates strictly in accordance with the Client’s requirements, in particular in the nuclear sector Procurement documentation is available on the Procurement Platform at: https://pz.pej.pl/open-preview-auction.html/379650
The subject of the procurement is a turnkey solar power system to be implemented for Finavia's properties, the content of which is described in more detail in the tender request appendices. The system will be implemented as a phased total contract. The estimated implementation period is during the years 2026-2028. The procurement includes design, delivery, installation, commissioning, documentation, and official processes. The solar power system contract type is a total contract. All work related to the construction of the solar power system will be carried out in the building's common construction site and contract area as follows: 1. Design of the solar power system. 2. Installation of the system, including panels, racks, inverters, cabling, and other necessary components up to the agreed contract interface (usually the electrical center). 3. Work related to the use and acceptance of the solar power system, operational and official inspections, testing, user training, and documentation required for technical maintenance. 4. If necessary, implementation of system maintenance according to a separate maintenance plan. Procedure and framework agreement The procurement will be carried out as a negotiated procedure. As a result of the procedure, a framework agreement will be established for the period 2026–2028. A maximum of four (4) suppliers will be selected for the framework agreement. Sub-areas 1-7 The sub-areas serve as example sites prepared for comparison and pricing. The sub-areas do not constitute a commitment to implement individual sites. The implementer of individual sites will be selected in mini-competitions within the framework agreement. Phased procedure and selection Phase 1: Assessment of tenderers' suitability. Phase 2: Preliminary tenders. Based on this phase, a maximum of 5 tenderers will be selected for the negotiation phase. Phase 3: Negotiations. Phase 4: Final tenders and selection for the framework agreement. A maximum of four (4) suppliers will be selected for the framework agreement. Award criteria In Phase 1, the tenderer must meet the minimum criteria and requirements defined in this invitation to participate. In Phase 2, the comparison will be made based on price. In Phase 3, the content of the implementations will be negotiated. In Phase 4, the actual procurement decision will be based on the final tenders, where the award criterion is the most economically advantageous tender with weighting: price 80% and quality 20%. Mini-competitions During the validity period of the framework agreement, individual procurements will be carried out as site-specific mini-competitions among the suppliers selected for the framework agreement. In the mini-competition, the requirements, schedule, and award criteria for the site will be specified.
Experienced and qualified Companies are invited to provide procurement and construction of temporary sanitary networks (commodity code UB00). This works are required to support the construction of the Poland Nuclear Power Plant. The scope of work covers the procurement and construction of temporary networks to support the construction of the nuclear power plant located on the Baltic Sea coast. As a result, temporary solutions will be developed for water and sewage networks, which will supply utilities to temporary buildings and installations requiring service during the construction period. Detailed design will be provided. Interested Companies must register/update their Contractor's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select commodity code UB00 as their specialty. If Contractor has any questions or intends to express interest in bidding this requirement, the Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire which Company would complete with response to Bechtel for review. Bechtel notes that previous proven experience with works of similar scale and complexity will be mandatory and providing additional documentation / evidence of previous experience may be required. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in providing the works in the past or current projects, (ii) safety record and compliance to quality requirements (see section 7),(iii) compliance to certification of legally mandatory requirements (including anti-corruption and sanctions), (iv) financial standing (solvency), and (v) organizational capabilities. In the event of high competitiveness of the proceedings (a large number of companies expressing interest), Bechtel reserves the right to conduct a preliminary preselection of companies for further proceedings, which demonstrate the greatest potential for performing the scope of work. Upon Bechtel’s evaluation of a response to the Poland Prequalification Questionnaire, Bechtel will notify if the Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. A Company's submission of Prequalification Questionnaire does not automatically qualify the Company to be a pre-qualified Company. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for execution of works at Jobsite. The Request for Quotation (RFQ) shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. The RFQ document will include the scope of works at Jobsite on the Poland AP1000 Project. The Company is responsible for providing fully qualified personnel to perform works. The Company is required to have: ISO 9001 or equivalent ISO 45001 and ISO 14001 Seller’s activities will need to comply with Polish Law and National Standards. Proposals may be provided in either EURO or PLN or USD. Furthermore, the proposals will be requested as a combination of lump sum items and fixed unit rate items. Award criteria shall be based on a combination of the highest evaluated scored bidder with consideration of the following key criteria in order of relevance, together with cost, which will determine the final decision for award which will be detailed further in the Bid Document(s) and during the RFQ phase. Previous Proven Relevant Experience Organizational Capability Environmental Health and Safety Performance Mobilization Schedule Compliance The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
Background and current situation: According to the overall arrangement agreement, the current supplier will produce district heating until 30.9.2027. An area map of the heating network and buildings is attached to the invitation to participate. Subject of the procurement and desired model: Sansia Oy will tender for the procurement of heat energy supply to the Peltoniemi campus area of Ylä-Savo Vocational College. The procurement includes a technical description of the solution and a preliminary implementation plan. The solution can be a centralized heating system, a hybrid system, or a decentralized system. The solution must not cause significant costs to the Client, e.g., for integration into the existing heating network. The implementation plan must take into account the schedule and tasks for the construction of a new building required by the solution, including permit processes. The transition plan will ensure uninterrupted heat distribution in the area during the operations, utilizing the Client's current backup heat source, and the transfer/construction operations will be scheduled for the summer of 2027, when the heat production capacity is at its lowest (for domestic hot water needs). The heat energy must be primarily based on renewable energy sources. Non-renewable energy can also be used in the system as part of backup heat production, to cover peak demand, or in situations where it is technically or supply-security justified. At this stage of the procurement, individual energy sources or technical solutions are not excluded, as long as the overall solution meets the procurement's requirements for renewability, supply security, and environmental objectives. The heat energy metering point will be in the heating plant/heating plants. The required heat energy will be purchased after metering, based on a EUR/month basic fee and a EUR/MWh energy fee. The annual energy demand is 1600 - 2000 MWh, and the peak power of the renewed equipment is at least 700 kW. Backup energy production is included in the procurement and must be located in the same building or in the immediate vicinity of the main equipment to ensure supply security. If the implementation of the solution requires the placement of a building or facility on the client's land. If the implementation of the procurement requires the placement of a building or facility on the client's land, a separate land lease agreement will be made, the terms of which will define, among other things, the lease period, compensation, and responsibilities for restoring the area at the end of the agreement. The overall package will be discussed in more detail as part of the negotiation process, and the terms will be presented at the tender stage. In the participation and negotiation phase, the candidate may present several alternative solution concepts as a basis for negotiations. In the final tender phase, each tenderer will submit one (1) final tender based on the solution clarified during the negotiations. A preliminary solution proposal in a competitive negotiation procedure is the tenderer's first, partially incomplete proposal for implementing the procurement. Its purpose is not to be a final tender, but to serve as a basis for negotiations, through which the contracting entity's needs are clarified and the best possible overall solution is found. The preliminary solution proposal must be at a sufficient level to initiate negotiations, but it is not required to contain final technical or commercial solutions. Supplier's responsibilities: Implementation and transition planning of the offered solution and implementation from the old system to the new, production, supply security, backup heat, metering, and reporting (to the client). Client's responsibilities: Contract interfaces, ownership/maintenance of the heating network. The estimated annual value of the procurement is approximately 150,000 Euros (VAT 0%). The client is not committed to the estimated annual amount. The planned start date of the contract is 1.10.2027. The contract is initially valid for at least 12 years, after which the contract continues indefinitely, terminable in writing with a twelve (12) month notice period. The description of the procurement may be specified in the final invitation to tender to be sent after negotiations.
Experienced and qualified Companies are invited to provide following services (commodity code UB00): • Supply, installation and servicing of portable toilets, • Supply, installation and servicing of portable sinks, • Additional sewage removal and disposal from on-site septic tanks. This service is required to support the construction of the Poland Nuclear Power Plant. The scope of work includes the supply, maintenance, and removal of portable toilet/sinks units, as well as the removal of sewage from septic tanks at the construction site. Interested Companies must register/update their Contractor's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select commodity code UB00 as their specialty. If Contractor has any questions or intends to express interest in bidding this requirement, the Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire which Company would complete with response to Bechtel for review. Bechtel notes that previous proven experience with portable sanitation services of similar scale and complexity will be mandatory and providing additional documentation / evidence of previous experience may be required. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in providing the portable sanitation services in the past or current projects, (ii) safety record and compliance to quality requirements (see section 7),(iii) compliance to certification of legally mandatory requirements (including anti-corruption and sanctions), (iv) financial standing (solvency), and (v) organizational capabilities. In the event of high competitiveness of the proceedings (a large number of companies expressing interest), Bechtel reserves the right to conduct a preliminary preselection of companies for further proceedings, which demonstrate the greatest potential for performing the scope of work. Upon Bechtel’s evaluation of a response to the Poland Prequalification Questionnaire, Bechtel will notify if the Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. A Company's submission of Prequalification Questionnaire does not automatically qualify the Company to be a pre-qualified Company. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: a. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or b. economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for portable sanitation services at Jobsite. The Request for Quotation (RFQ) shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. The RFQ document will include the scope of services at Jobsite on the Poland AP1000 Project. The Company is responsible for providing fully qualified personnel to perform sanitation services. Additionally, the company shall provide uniforms and equipment in accordance to scope of work. The Company is required to have: • ISO 9001 or equivalent • ISO 45001 and ISO 14001 • Seller’s activities will need to comply with Polish Law and National Standards. Proposals may be provided in either EURO or PLN or USD. Furthermore, the proposals will be requested as a fixed unit rate items. Award criteria shall be based on a combination of the highest evaluated scored bidder with consideration of the following key criteria in order of relevance, together with cost, which will determine the final decision for award which will be detailed further in the Bid Document(s) and during the RFQ phase. a. Technical Capability b. Previous Proven Relevant Experience c. Environmental Health and Safety Performance The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
Experienced and qualified Companies are invited to provide trash services (commodity code UB00). This service is required to support the construction of the Poland Nuclear Power Plant. The scope of work is for removal and utilization of non-hazardous and hazardous waste generated during process of construction site and waste generated by the site project area on a construction site of Poland Nuclear Power Plant (NPP) and all required waste reporting and recordkeeping activities in BDO system on behalf of Bechtel. In total approximately 37,000 Mg of waste would be generated during the period of preparatory work and approximately 137,000 Mg of waste is estimated to be generated during the construction and the commissioning period of the nuclear power plant. Companies wishing to participate in the procurement procedure must have: - the appropriate permit issued by local authorities for the disposal of liquid/solid waste, and - signed contract with a local wastewater treatment plant/solid waste landfill, or identify its key subcontractor holding such permit and contract and present them during the procurement process. Interested Companies must register/update their Contractor's information in Bechtel's iSupplier portal at https://supplier.becpsn.com link and select commodity code UB00 as their specialty. If Contractor has any questions or intends to express interest in bidding this requirement, the Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire which Company would complete with response to Bechtel for review. Bechtel notes that previous proven experience with trash services of similar scale and complexity will be mandatory and providing additional documentation / evidence of previous experience may be required. The prequalification questionnaire includes a list of questions required to be considered as prequalified, and examples to include demonstration of (i) experience in providing the trash services in the past or current projects, (ii) safety record and compliance to quality requirements (see section 7),(iii) compliance to certification of legally mandatory requirements (including anti-corruption and sanctions), (iv) financial standing (solvency), and (v) organizational capabilities. In the event of high competitiveness of the proceedings (a large number of companies expressing interest), Bechtel reserves the right to conduct a preliminary preselection of companies for further proceedings, which demonstrate the greatest potential for performing the scope of work. Upon Bechtel’s evaluation of a response to the Poland Prequalification Questionnaire, Bechtel will notify if the Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. A Company's submission of Prequalification Questionnaire does not automatically qualify the Company to be a pre-qualified Company. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: a. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or b. economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for trash services. The Request for Quotation (RFQ) shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. The RFQ document will include the scope of services on the Poland AP1000 Project. The Company is responsible for providing fully qualified personnel to perform trash services. Additionally, the company shall provide uniforms and equipment in accordance to scope of work. The Company is required to have: • ISO 9001 or equivalent • ISO 45001 and ISO 14001 • Seller’s activities will need to comply with Polish Law and National Standards. Proposals may be provided in either EURO or PLN or USD. Furthermore, the proposals will be requested as a combination of lump sum items and fixed unit rate items. Award criteria shall be based on a combination of the highest evaluated scored bidder with consideration of the following key criteria in order of relevance, together with cost, which will determine the final decision for award which will be detailed further in the Bid Document(s) and during the RFQ phase. a. Technical Capability b. Previous Proven Relevant Experience c. Environmental Health and Safety Performance The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
This announcement of a Supplier Qualification System serves as a call for tenders as regulated by Spanish and European legislation on procurement in the water, energy, transport, and postal services sectors.
In the context of starting the large-scale production of Lutetium-177, a collaboration has been set up with SCK CEN, the Belgian Nuclear Research Center. For the transport of solid irradiated target material to the radioisotope production center, located at SCK CEN in Mol, IRE needs a certified Type B(U)-package for use as a medical isotope container.
1. Experienced and qualified Companies are invited to provide engineering and construction services, including supply, installation, testing and commissioning of Temporary Warehousing Structure and Fabrication Shops (commodity code UA11) at the project location for the Poland Nuclear Power Plant. The facilities are industrial standard, temporary, non-safety related, non-seismic, commercial-grade steel buildings, intended solely to support construction activities and not plant operations. All works must comply with Polish law, EU standards, and Authority Having Jurisdiction (AHJ) requirements, with the Pomeranian Voivode acting as AHJ. General Building Characteristics: - Structures are steel-framed, modular or pre-engineered metal buildings (PEMB). - Buildings are single-story, rectangular, low-rise, with pitched roofs. - Facilities must remain fully operational year-round in a Baltic coastal environment for a design life of 15 years. - All buildings are electric-only; no gas installations are permitted. - Uniform construction technology, finishes, and systems must be applied across all buildings for each of two types of buildings: warehouses and fabrication shops. - All furnish and production lines are excluded from the scope, the subject of the bid is limited to the solely buildings only. Temporary Warehousing Buildings – Quantity and Size 3 temporary warehouse buildings, total area 22,170 m²: - Warehouse 182: 8,400 m² (120 × 70 × 10 m) - Warehouse 183: 7,650 m² (150 × 51 × 10 m) - Warehouse 184: 6,120 m² (120 × 51 × 10 m) Structural and Architectural Requirements - Reinforced concrete slab foundations designed for heavy material handling. - Steel superstructure enclosed with insulated metal wall and roof panels. - Fire-resistant construction materials. - Concrete floor finish throughout. - Light-colored exterior siding and roofing. Functional Requirements - Areas for receiving, unpacking, sorting, staging, and “on-hold” materials. - Segregated storage for tools, instruments, piping, electrical materials, and hazardous goods. - Pallet racking, shelving, bins, and forklift-compatible aisle spacing. - Rapid roll-up material doors (minimum 6 m clearance). - Minimum four personnel/emergency exits per building. - Climate control (heating, ventilation, and cooling where required). - Access control via card, mobile app, or biometric systems. - Adequate drainage, lighting, and proximity to work fronts. - Overhead crane in the warehouse No. 184 Temporary Fabrication Shops – Quantity and Size 11 fabrication buildings, total area 20,735 m². Each building: 1,885 m² (65 × 29 × 10 m). Structural and Architectural Requirements - Reinforced concrete slab foundations. - Commercial-grade steel superstructure. - Insulated metal siding and roofing. - Fully enclosed, climate-controlled environments. - Ventilated. Functional Requirements - Fabrication lines and material handling areas. - Tool and equipment storage with secure access. - Rapid roll-up material doors and personnel exits. - Fire-resistant materials and systems. - HVAC systems. - Adequate site drainage and lighting. - Layout flexibility subject to Buyer approval. Building Systems and Installations (Applicable to All Buildings) Structural - Designed for dead, live, wind, snow loads. - Anchored steel structures on reinforced concrete slabs. Mechanical (HVAC) - Air handling units with heating, cooling, filtration, and heat recovery. - Dedicated ventilation systems for warehouses and workshops. - Electric-powered systems only. - No permanent water or sewage systems; portable handwash stations only. Fire Protection - Fire classification per Polish regulations (ZL I or as determined). - Fire alarm system. - Emergency lighting. - Internal hydrants (25 mm), fire extinguishers, fire dampers. - External hydrants with 20 dm³/s water flow. - Fire access roads and rescue provisions. Electrical - 400/230 V, 50 Hz TN-S earthing system. - Main distribution panels and sub-panels. - LED lighting (normal and emergency). - Emergency lighting minimum 90 minutes autonomy. - IP54-rated electrical enclosures. - Lightning protection per PN-EN 62305. Design, Permits, and Compliance - Seller responsible for full design, engineering, and coordination. - Final Design must be sealed by licensed Polish engineers/architects. - Compliance with Polish law, EU directives, and project specifications is mandatory. The detailed scope of work will be outlined in the specifications, scope documents, and other contractual materials provided to the Companies within the Request of Quotation.
Conclusion of a supply contract / Supply of intermediate rods for the years 2026-2032 BT-70 OPT-060 III.4.7) Continuation of the conditions related to the performance of the contract: 2. The conclusion of the Contract is subject to the contracting authority, as the licensee, having a manufacturing license from the Hungarian Atomic Energy Authority (hereinafter: HAEA) for the product of the tenderer, which, in the case of a system element to be newly installed in the blocks of the Paks Nuclear Power Plant, during the licensing procedure for the modification of the system element, based on the documents and fulfillment of requirements provided by the tenderer for the procedure, will be obtained by the licensee. The current HAEA license applies to the SKODA JS a.s. manufactured intermediate rod as described in the document according to the Technical Description and Operating Instructions version 5 of Ae 4574/Dok/R approved in HAEA license number HA6080. To verify point 1 above, the contracting authority requests a declaration from the tenderer as part of the bid, which the contracting authority will check no later than before the conclusion of the contract. Failure to comply with any declaration shall be considered as the withdrawal of the winning tenderer, in which case the contracting authority may conclude the contract with the tenderer ranked as the next most favorable tenderer during the evaluation of the bids, if it has identified them in the written summary of the bid evaluation, in accordance with Section 131 (4) of the Public Procurement Act. 3. Minimum requirements for contractual conditions: The contracting authority considers the provisions of point 5.15.6 of point 5.15 (Statements of the Supplier related to the conclusion of the Contract) of the Draft Contract as minimum requirements for the contractual conditions, in accordance with Section 87 (1) of the Public Procurement Act, which it will not negotiate with the tenderers. Detailed information is contained in the KD.
QMMO26-4069 - Supply and off-take (injection) of 100% green electrical energy and the provision of the necessary capacities for 2029 to the various sites of the members of the KU Leuven Association and privileged partners - Lots A to P