Open501294-2026Disciplines & Systems / Turbine Island & General Utilities / General Utilities

Poland – Construction work – Electric Auxiliary Boilers

Poland
Deadline unavailable
Overview

The scope of work for this package consists of design, furnishing materials, fabrication, inspection, testing, and documentation for packaged electrode type electric boiler, deaerator, blowdown flash tank, boiler feed system, chemical feed system complete with all required controls and instrumentation. The auxiliary boiler has estimated net steam output of 46,000 kg/hr at 13.79 bar. The packaged boiler shall be designed, fabricated, tested and stamped in accordance with EN standards; including but not limited to: a. PN-EN 13445 Unfired Pressure Vessels b. PN-EN 12953 Shell Boilers NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual numbers will be included in official bid package.

Procedure
Not provided
Notice type
Contract notice (standard)
Contract nature
Works
Legal basis
other
Common Procurement Vocabulary (CPV)
45000000 — Construction work
Published
19 July 2026 at 22:00

Lots 1

Electric Auxiliary Boilers

45000000 — Construction work

Documents

Unlock tender documents

Sign in or register for free to view this tender information.