Nepal to Import Power from India Following Hydropower Damage
Nepal is preparing to import up to 1,100 MW of electricity from India during the dry season, which spans from December to May 2027. This measure addresses a temporary reduction in the country's generation capacity due to recent flash floods, landslides, and heavy monsoon rains that damaged hydropower projects.
The Nepal Electricity Authority (NEA) is developing a work plan for this period, as electricity generation from run-of-the-river hydropower projects typically declines significantly during the dry season, while demand increases. The combined impact of the Bhotekoshi floods and subsequent heavy rainfall has resulted in a loss of approximately 640 MW of generation capacity.
Despite the damage to its hydropower infrastructure, Nepal is currently exporting between 600 MW and 700 MW of electricity to India. Cross-border electricity trade between India and Nepal has expanded in recent years, allowing Nepal to export surplus power during the wet monsoon months and import during the dry season.